Getting a new roof in East Yorkshire: what to expect

By , owner & lead roofer6 min read

If you have never had a roof replaced, the week it happens can feel like a mystery: a scaffold goes up, a skip arrives, and a team you met once at the quote starts taking your house apart from the top. A re-roof follows the same order on almost every East Yorkshire house — survey and quote, scaffold, strip, underlay and battens, tiles or slates, lead and ridge, then clean-up and handover — and a typical semi or terrace takes 5–10 working days.

1. The survey and the quote

It starts with a free visit. We look at the roof from inside the loft and from the ground and, where access allows, fly it with our CAA-registered drone, so you get photographs of every slope, ridge, valley and chimney stack without anyone hiring a scaffold just to look.

Then you get a fixed price in writing. It sets out what the job includes — scaffolding, stripping and waste, underlay and battens, the covering, ridge and verge fixings, lead work, and Building Regulations notification where it is needed — so there is no doubt about what is going on the roof. It does not change once the work starts, other than for something genuinely hidden, which we come to below. There is no deposit; you pay on completion.

If you are not yet sure the roof needs replacing at all, read re-roof or overlay the old roof? first. It explains why we strip a roof rather than lay new tiles over the old.

2. Scaffolding

Almost every re-roof needs a full scaffold around the house, and it is included in the price rather than left for you to arrange. It usually goes up a day or two before we start, stays for the length of the job and comes down a day or so after. Our guide to scaffolding for roof work covers what is needed and why, including the smaller jobs that can be done without it.

3. Stripping the old roof, and what we find

The old tiles or slates come off first, then the battens and the old felt underneath, and it all goes into the skip. This is the noisy, dusty part of the job and the point at which the roof looks worst from the street.

Most of what we find is routine: battens split or rotted at the nail holes, a rafter end gone soft where a gutter overflowed for years, a few tiles that were never fixed. Occasionally it is more. Either way, we do not carry on and present you with a bill at the end: we show you what we have found, explain the options and agree any extra cost with you before going further. We strip only what we can make watertight the same day, so an afternoon shower does not reach your ceilings.

4. Membrane and battens

With the rafters bare and any repairs made, the new breathable underlay goes on. It keeps wind-driven rain and snow out if a tile ever slips, and it lets moisture from the house escape rather than condensing in the loft. Our guide to breathable roofing membrane explains why that matters in a damp loft.

New treated battens are fixed over the underlay at the exact gauge the tiles need, so every course sits straight and every tile can be fixed to the standard. From this point the roof is weathertight again, before a single tile goes on.

5. Tiles or slates

The covering goes on from the eaves up, each course lapping the one below, fixed to BS 5534 so it stays put in the easterly gales East Yorkshire gets off the sea. Concrete interlocking tiles are the most affordable and typically last 40–60 years; clay pantiles are traditional to the region and last 60 years or more; natural slate costs more but can pass 100 years.

6. Lead work and the ridge

The details are where roofs leak, so they get the most care. Where the roof meets a chimney or a wall, new lead flashings are cut, dressed and fixed into the brickwork rather than stuck on with sealant. Valleys are formed in lead or GRP so the water from two slopes runs away cleanly.

The ridge and hips are finished with a dry-fix system: the ridge tiles are clamped and screwed to the roof over a ventilated roll rather than bedded in mortar. It meets the current standard, it resists storms, and there is no mortar to crack and wash out in a few winters. Verges are dry-fixed in the same way.

7. Clean-up and the guarantee

On the last day the gutters are emptied of the grit and off-cuts a re-roof always sheds, the ground is cleared and swept, and the skip is collected. We photograph the finished roof, by drone where access allows, so you can see the ridges, valleys and flashings up close without leaving the ground.

You then get your full written invoice and our written workmanship guarantee, which covers new roofs for 15 years, backed by £5 million public liability insurance and a directly employed team rather than subcontractors. Our guide to roofing guarantees and insurance explains what those pieces of paper actually cover.

How long it takes

A typical semi-detached or terraced house takes 5–10 working days, depending on its size, the covering and the weather. A larger detached house, or a cut-up roof with dormers and several valleys, takes longer. You get a firm timescale in your quote, and the house is left watertight at the end of every working day.

What it costs

The price of a full re-roof, up and over, depends on the size and pitch of the roof, the covering you choose, the scaffolding it needs and the condition of the timber underneath. The current prices for one side of a roof and for a full re-roof, with what moves them up or down, are on our roofing costs page, which is kept up to date from the same price list we quote from.

Frequently asked questions

Do I need to move out while my roof is replaced?

No. The work is done from outside, from the scaffold, and the house is left watertight at the end of every day. You will hear it, and the drive or front garden will hold a skip and materials for a week or so, but you can live in the house as normal.

What happens if it rains during a re-roof?

We only strip as much roof as we can make watertight the same day, and the new breathable underlay goes on as the old covering comes off, so a shower does not get into the house. Heavy weather can cost a day or two, which is why the timescale in your quote allows for it.

Will you tell me before any extra cost?

Yes. Your quote is a fixed price for the work quoted. If we find something that could not be seen before the tiles came off — rotten battens or a rafter end, say — we show you, explain the options and agree any extra cost with you before going any further.


Thinking about a new roof? We give free drone surveys and fixed written quotes for roof replacement across Hull, Beverley, Goole, York and the East Riding, with a 15-year written guarantee and no deposit.

Re-roofingAdvice

← Back to all guides

Got a roofing problem you'd like sorted?

Tell us about the job and we'll give you a clear, fixed price. 15-year workmanship guarantee, £5 million public liability, and fully insured.

No obligation · No pressure · Free drone survey